MEI recently completed electrical works on a new raft for the MOD at Loch Goil. Following initial construction by Briggs Marine, MEI was tasked with the full installation of all electrical components. This included developing the electrical design and installing new cabling, cable trays, a distribution board, transformer, and all internal electrical fittings.